Complete three to five line items such as Job shop, batch, assembly line, or continuous flow approach, on the Process Design Matrix.

Drugs and Society
August 15, 2017
Describe an example of an ERP, CRM or re-engineering activity in your organization within the last 2 years.
August 15, 2017
Show all

Complete three to five line items such as Job shop, batch, assembly line, or continuous flow approach, on the Process Design Matrix.

Complete the Process Design Matrix. ( Material Attached)

Write an executive summary identifying appropriate design approaches for a selected product and service.

  • Pick one service with which you are familiar.  Complete three to five line items such as production line, self-service, or personal attention approach, on the Process Design Matrix.
  • Pick one product with which you are familiar.  Complete three to five line items such as Job shop, batch, assembly line, or continuous flow approach, on the Process Design Matrix.

Leave a Reply

Your email address will not be published. Required fields are marked *