Project Communication

On the basis of the News on page 466, how do U.S. furniture manufacturers feel about NAFTA? How about farmers?
August 3, 2017
Globalization
August 3, 2017
Show all

Project Communication

Topic: Project Communication

Subject area: Management

Number of pages: 5

Writing style: APA

Type of document: Term Paper

Academic level: Master

Number of sources/references: 5

Details:
Read the weekly assigned chapters and view the lectures before beginning the assignment.
Read the case study titled “Developing a Missile: The Power of Autonomy and Learning.” before starting this assignment.
Write a five to six (5-6) page paper in which you:
1. Formulate a one (1) paragraph vision statement for the team project as project leader for the Joint Air-to-Surface Standoff Missile program.
2. Analyze key actions that Terry Little took to foster higher levels of performance, and recommend, in retrospect, a new course of action for a comprehensive organizational change as if you were in his position.
3. Describe the fallacies, consistencies, and inconsistencies that emerged from Terry Little’s leadership tactics, geared toward inspiring the team to greater heights. Construct an argument for how you would have acted differently than Terry Little and support the position.
4. Recommend at least three (3) strategies to the Joint Air-to-Surface Standoff Missile program management team with a view to improving its operational performance. Provide three (3) specific examples to support the response.
Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions.
• Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length.
Follow APA format
Check for grammar
When examples need to be provided, make sure you list them
The specific course learning outcomes associated with this assignment are:
Analyze differences in how people communicate across different cultures, and use effective communication strategies to foster positive and productive project team communication.
Use technology and information resources to research issues in project management leadership and project communication.

Leave a Reply

Your email address will not be published. Required fields are marked *