Benchmark – Kitchen Heaven Project Case Study

Orgnaization planning and management
April 1, 2022
Benchmark – Team Dynamics
April 1, 2022
Show all

Benchmark – Kitchen Heaven Project Case Study

Assessment Description
The purpose of this Case Study assignment is to walk through the logical framework (LogFrame) and to create the project management documents needed to successfully lead a project.

General requirements:

Reread the Kitchen Heaven Project Case Study in Heldman et al. pages 84-87, 139-141, and 283-285 and read pages 190-193. 

Part 1: Action Steps Column (A)

Create a list of action steps or activities and enter them in the Inputs (the yellow portion) of the Logical Framework template. Be sure to include the associated Outcome each activity (see template). For each action step/activity add at least one assumption made related to the completion of the action step/activity.
Only define the action steps required to achieve each outcome. Resources, budget and due dates will be completed in Topic 7.
Each action step/activity should contain one and only one deliverable (i.e., one document, one action completed, one delivery made)
Each outcome will consist of a minimum of five action steps/activities.
Each action step/activity will have at least one assumption.
Part 2: Project Life-Cycles

Describe, in 500-750 words, the five project life-cycles defined by Schmidt (predictive, iterative, incremental, agile, and hybrid) and justify which life-cycle should be used to complete the Kitchen Heaven Project.
Minimum of three outside resources. Sources must be authoritative and not from a Wikipedia-type source.
Prepare this assignment according to the guidelines found in the APA Style Guide, located in the Student Success Center.

Leave a Reply

Your email address will not be published. Required fields are marked *