strategic Appli in project management

Assignment: Indicator Construction
March 28, 2022
Chapter13-ProgressandPerformanceMeasurementandEvaluation.pptx
March 28, 2022
Show all

strategic Appli in project management

 

Assigned Readings:Chapter. 13 Progress and Performance Measurement and EvaluationInitial Postings: Read and reflect on the assigned readings for the week. Then post what you thought was the most important concept(s), method(s), term(s), and/or any other thing that you felt was worthy of your understanding in each assigned textbook chapter.Your initial post should be based upon the assigned reading for the week, so the textbook should be a source listed in your reference section and cited within the body of the text. Other sources are not required but feel free to use them if they aid in your discussion.Also, provide a graduate-level response to each of the following questions:

  1. Why is it important for project managers to resist changes to the project baseline? Under what conditions would a project manager make changes to a baseline? When would a project manager not allow changes to a baseline?

[Your post must be substantive and demonstrate insight gained from the course material. Postings must be in the student’s own words – do not provide quotes!] [Your initial post should be at least 450+ words and in APA format (including Times New Roman with font size 12 and double spaced). Post the actual body of your paper in the discussion thread then attach a Word version of the paper for APA review] 

 

 Read the Case “Shoreline Stadium Status Report Case”  at the end of chapter 13 and response to the following questions:You are an assistant to Percival Young, president of G&L Construction. He has asked you to prepare a brief report on the status of the Shoreline Stadium project.(Rest of case not shown due to length.) 

Leave a Reply

Your email address will not be published. Required fields are marked *