Problem analyses in project management

If the United States elects to terminate its involvement in NAFTA, would Canada and/or Mexico have any recourse against the United States?
August 3, 2017
Forced Migration Africa
August 3, 2017
Show all

Problem analyses in project management

Problem analyses in project management

Project and Presentation:
not more than 15 slides-In Power point and then copy to word.
Individually.
Send to the Instructor on CD-ROM or Flash Memory (not be back to you).
It must include the same steps that included in the assignment section. Use at least 4 Different references excluding the Textbook.

 

Notes:
-Each Student have to work based on the previous conditions.
-The Topics, due date, and other Details for each section will be given to you soon.
-Write in a Font size: 14 for Ward and 24 for PowerPoint

-Without submitting the Assignment to the Instructor, No Project will be given to the Student.
– Do not delete anything before the Instructor receives CD or Flash from your side, otherwise you will lose your mark.

Leave a Reply

Your email address will not be published. Required fields are marked *