Methods of Accelerating and Decelerating Construction Projects

Optimal Brain Development
August 3, 2017
British control of India
August 3, 2017
Show all

Methods of Accelerating and Decelerating Construction Projects

Methods of Accelerating and Decelerating Construction Projects

Paper details

Project Description
The final project is to write a short review paper in your topic of interest in construction planning and scheduling. Here are steps to successfully compete this final

project:
Step 1: Choose a topic:
Select a subject of your interest in construction planning and scheduling and get the confirmation for your topic (no later than Nov 14). Find a relatively narrow

topic. You may take a look at recent publications of the journals listed in appendix to get an idea (In this step reading abstracts will help you to get the message of

these papers).
Step 2: Literature review:
? Find journal and conference papers related to your topic.
? Read the papers and find key points of these papers
? Look for the results of these papers and try to produce a coherent argument
? Try to analyze, synthesize and interpret other than just summarizing the literature
Step 3: Discussion and Conclusion:
? Compare and discuss the results in different papers. Using tables is recommended
? Conclusion should illustrate the significance of your paper, present your major points and findings.
NOTE:
? Your references should include more than 10 papers
? You can use a WCU library or google scholars.
? You need to list your references using the APA format: https://owl.english.purdue.edu/owl/resource/560/01/
? Your paper needs to be in a format that includes an abstract, introduction, literature, main body and conclusion. The final reports need to be minimum of 6 pages

that include your abstracts (Single space, 12 Times and New Roman)

Leave a Reply

Your email address will not be published. Required fields are marked *