Any topic (writer’s choice)
November 23, 2020
Project Wrap Up
November 23, 2020
Show all

Project Scope Lessons Learned and Integration Paper

Please prepare a 6-8-page paper outlining the following:
1.Evaluate this question: Why is project scope management considered the foundation element of a successful project?
2.Lessons Learned:  Please identify 3 project scope management lessons learned or best practices.  How will you use these lessons or best practices in the future to ensure successful project planning?
3.Integration:  Explain how project scope management processes and outputs are used by other project management elements (for example, project scheduling, resource allocation, budgeting, risk management and quality management).
4.Please provide at least 4 additional references outside the course texts and guides.

Format:
Below are some key guidelines you will want to ensure you follow in all three elements of this assignment. Think of this short list as a quality control checklist, along with the attached grading rubric.
Paper should be submitted as a single file (MsWord or .pdf)
You should include a cover page
You should format the documents professionally
References and citations are requiredEnsure you include the appropriate number of project scope lessons learned (at least 3)

Double line spacing between paragraphs but 1.5 spacing within the paragraph
12-point Times Roman
1-inch margins
Please use footnotes or endnotes and citations
12-14-point font, bold headings and subheadings
Please adhere to APA conventions.

Please see the attached file for rubrics!

Leave a Reply

Your email address will not be published. Required fields are marked *