Q
Project the estimated reduction in greenhouse gas emissions and operating cost savings that will result from the proposed net zero project in years 2008-10. (Assume for the purposes of your analysis that all equipment upgrades are made immediately at the start of 2008.)
Equipment upgrades are to achieve a 75% reduction in water use, an 80% reduction in natural gas consumption, and a 90% reduction in purchased electricity.
Use excel.
Attachments: