compter science( Project Report)

health and wellness program
August 7, 2017
Project financing
August 7, 2017
Show all

compter science( Project Report)

Additional Requirements main report.

? Use network component icons developed in the laboratory worksheets (or those below).

? Use Visio or equivalent drawing package to construct your diagrams showing the logical structure of your design between Kingston Hill campus, knight bridge campus and Penrhyn road campus.

? Show diagrams of the network and the at least two monitoring stations.

? Use print screen of monitoring tool to show performance of these three campus

? Show print screen of performance metrics( Two print screens)

? Show print screen of monitoring tools(two print screens)

? Show breakdown structure

? What needs to be in place before beginning experiment

? Discuss what sort of monitoring tools to be used and what will be measured on the networks

? Discuss 3-4 monitoring tools published. Find out about each.

? Contract advantages/disadvantages when you decide which to use.

? Discuss the network you are monitoring.

? Discuss how you will measure performance

? Download speed,end- to ?end delay,jitter variability of the delay, packet loss,show end-to-end measurement

? Screen shot of Nagios and MRTG(THE MULTI ROUTER GRAPHER) MONITORING CAN SHOWN AND EXAPLAIN ITS CONTENT OF USE .

I seek your kind assitance to note of the following instructions for above ref: work.

1. Include Bibliography

2.leave one line space between writings

3. Report should be in power point slice.


Leave a Reply

Your email address will not be published. Required fields are marked *